Train-18 in Trouble: IRCTC refused to provide food services

1298
Rajasthan Tourism App - Welcomes to the land of Sun, Sand and adventures

National| The railway’s well-known train-18 is not getting rid of from the disputes. Earlier it was to be flagged off by Prime Minister Modi on December 29 but it was unable to pass the state-of-the-art new train safety standards. Now IRCTC has refused to provide food service on this train.

Even before its first visit, a new controversy has now emerged with the much talked about train set 18 in the dispute. IRCTC CMD MP Mal said that there is no care of catering service in the internal design of Train-18. There is no place left in train-18 so that the food served to the passengers can be stored.

It is a distant thing to be cooked in it, even if it is brought out from the outside, it should be a place to keep it for a while, which is not in train-18. In such a way, it can only be kept near the bathroom which is not suitable.

In such a situation, IRCTC has cleared that they cannot serve food in the present condition. IRCTC has given several suggestions to make the place to keep the food in the train. Already in the internal design of Train-18, which has been going through many trials of the trial, the Railways will now have to make changes according to IRCTC.

Already in the internal design of Train-18, which has been going through many trials of the trial, the Railways will now have to make changes according to IRCTC. It is clear that in the train set 18, the aspect of catering has not been taken into consideration, which has resulted in not having enough room for drinking in this world class train. There is not enough space to store food safely and cleanly. Not only this, there is a lack of space for serving food to railway passengers.

Due to this, the train set 18 is emphasizing on changing the design with catering. IRCTC has also told the ministry and coach factory about the problems faced by this shortage and catering in the design. IRCTC objected that in the train set 18, there is not even one-third of the caterers against the capital, which may have to face considerable adversity till food service from serving to food.

The ICF, which is the coach factory in which train set 18 is made, has given assurance to change the design in the next train to overcome this major problem. On this, Railway Minister Piyush Goyal said that "Suggestions are coming in. This suggestion is also welcome". But the question is why was IRCTC not being part of planning while designing such an important train?

Railway Minister Piyush Goyal has already cleared that this train will be started between Delhi and Banaras only. Railway Minister told that the railway safety commissioner has given suggestions to make some corrections, after which the time will be taken by the prime minister. Only then will the date of the beginning of train-18 be declared. Let us tell you that Train-18 is the first such train in the country which will not have any engine separately, but it will have a power kit under some coach, which will run the train.

Rajasthan Tourism App - Welcomes to the land of Sun, Sand and adventures

LEAVE A REPLY

Please enter your comment!
Please enter your name here